Refurbishment Following the Follett Committee Report (1994) an estate grant was obtained from the funding council (SHEFC) that enabled the relocation of all our library facilities to Dalhousie Land to be planned. The architects for this project were the Dodd Jamieson Partnership (Lewis & Hickey DJP). The plans involved the retention of the original concrete container of the swimming pool. This was redesigned to house the periodicals collection. The ground floor (at level of the original swimming pool edge) was designed as the main stock area and Service Desk. A mezzanine area was inserted on the south side and housed the Children's Book collection. The large 250 seat DHL Lecture Theatre was initially retained. The top floor was opened out to house library and computer work stations. This new Library was opened in August 1996. Following the merger with the University in August 1998 there was a further adaptation undertaken in 1999/2000. This involved extending the basement area and flooring over of the lecture theatre, enabling the Cramond Library stock to be transferred to Holyrood in June 2001. The new floor 3 created additional work spaces and the deployment of 25 Apple computers. This modern Moray House Library is now one of the principal site libraries of the University.
|
||||||
| [ Top of Page | Estates Map Page | Maps, Estates & History - Intro | School Homepage ] |
||||||
|
Published by the Moray House School of Education, Old Moray House, Holyrood Road, Edinburgh EH8 8AQ All material is copyright © The University of Edinburgh, Moray House School of Education |